Target

We patched broken, eroded and severely damaged asphalt. After saw cutting to remove the damaged asphalt and re-compacting the existing limerock base material, we tacked areas with a primer tack. We then installed full depth SIII Hot Mix Asphalt and compacted the area to the desired compaction rate. Once complete, we removed and recycled all old asphalt.

Menu
Resize Font
Contrast