Target

We patched broken, eroded and severely damaged asphalt. After saw cutting to remove the damaged asphalt and re-compacting the existing limerock base material, we tacked areas with a primer tack. We then installed full depth SIII Hot Mix Asphalt and compacted the area to the desired compaction rate. Once complete, we removed and recycled all old asphalt.

Menu